Skip to content
Vancouver IslandGeomatics
RTK rover recording an as-built shot at the back of curb

Record What Was Built

As-Built Surveys

Design drawings show intent; as-builts record reality. We measure constructed works, utilities, surfaces, structures, and deliver the record that closes out projects, satisfies acceptance requirements and becomes the permanent memory of what's actually in the ground.

The discipline is timing: the cheapest as-built measurement is the one taken while the trench is still open. We build pickups into the construction rhythm so nothing gets buried unmeasured.

01

What we record

  • Underground services before backfill: position, elevation, material
  • Finished grades and surfaces against design
  • Structures, slabs and building elements against tolerance
  • Roadworks and drainage for acceptance packages
  • Deviations from design, documented while they're explainable
02

Records that get accepted

Municipal acceptance and engineer certification both run on credible as-built data. We prepare record drawings and datasets to the standards your engineer and municipality expect, in the project coordinate system, consistent with design and layout, ready to submit.

03

Beyond compliance

As-builts pay off twice: once at acceptance, and again years later when someone plans a repair, an addition or an excavation. For owners maintaining assets, we deliver as-built data GIS-ready, so the record stays usable instead of buried in a drawer.

Deliverables

  • As-built record drawings (DWG/PDF)
  • Measured utility records pre-backfill
  • Acceptance packages
  • GIS-ready asset data on request

Coverage

Available across Vancouver Island.

We provide as-built support across the Island, as part of full construction-survey packages from our Courtenay base, and as standalone record surveys where a project needs measured truth for close-out or acceptance.

Service areas

Common questions

Can you as-built work that's already buried?+

Partially, surface evidence and records get us some of the way. The honest answer is that pre-backfill measurement is irreplaceable, which is why we push to schedule pickups during construction rather than reconstruct afterward.

Do municipalities accept your as-built records?+

We prepare records to the format and standard the accepting authority requires. That's a scoping conversation at the start, so submission day holds no surprises.

Related services

Send us the scope.

Tell us what you need and where and we'll have pricing and a realistic schedule back within one business day.

Get a Quote →