Skip to content
Vancouver IslandGeomatics
RTK rover recording an as-built shot at the back of curb

Record What Was Built

As-Built Surveys

Design drawings show intent; as-builts record reality. We measure constructed works — utilities, surfaces, structures — and deliver the record that closes out projects, satisfies acceptance requirements and becomes the permanent memory of what's actually in the ground.

The discipline is timing: the cheapest as-built measurement is the one taken while the trench is still open. We build pickups into the construction rhythm so nothing gets buried unmeasured.

01

What we record

  • Underground services before backfill — position, elevation, material
  • Finished grades and surfaces against design
  • Structures, slabs and building elements against tolerance
  • Roadworks and drainage for acceptance packages
  • Deviations from design, documented while they're explainable
02

Records that get accepted

Municipal acceptance and engineer certification both run on credible as-built data. We prepare record drawings and datasets to the standards your engineer and municipality expect — in the project coordinate system, consistent with design and layout, ready to submit.

03

Beyond compliance

As-builts pay off twice: once at acceptance, and again years later when someone plans a repair, an addition or an excavation. For owners maintaining assets, we deliver as-built data GIS-ready, so the record stays usable instead of buried in a drawer.

Deliverables

  • As-built record drawings (DWG/PDF)
  • Measured utility records pre-backfill
  • Acceptance packages
  • GIS-ready asset data on request

Coverage

Available across Vancouver Island.

We provide as-built support across the Island — as part of full construction-survey packages from our Courtenay base, and as standalone record surveys where a project needs measured truth for close-out or acceptance.

Service areas

Common questions

Can you as-built work that's already buried?+

Partially — surface evidence and records get us some of the way. The honest answer is that pre-backfill measurement is irreplaceable, which is why we push to schedule pickups during construction rather than reconstruct afterward.

Do municipalities accept your as-built records?+

We prepare records to the format and standard the accepting authority requires — that's a scoping conversation at the start, so submission day holds no surprises.

Related services

Send us the scope.

Tell us what you need and where — we'll have pricing and a realistic schedule back within one business day.

Get a Quote →